Every QA team has that moment.

Someone runs the automated tests, and suddenly some of them fail. They fail once, then pass on the next run. Or the third. Or after a small tweak. Someone reruns the pipeline, the build turns green, and the team moves on. No ticket is created. No task is added to the sprint. Nothing appears in the report.

And that is exactly why flaky tests are so dangerous.

They don’t stop delivery immediately. But the cost doesn’t disappear. It just moves underground. They slowly drain trust, focus, and energy — until one day the entire test suite is questioned.

How Flaky Tests Usually Enter a Project

Flaky tests are not loud problems. They don’t crash or stop the process immediately. They fail sometimes, pass sometimes, and live in that dangerous gray area where it looks easier to ignore them than to fix them.

At first, the team treats them as noise. A temporary annoyance. Something caused by “the environment,” “timing issues,” or “CI being slow today.”

Over time, though, patterns start to form.

The same test fails again — but only sometimes when the app animations are slow. Another one breaks when the pipeline runs in parallel. A third fails only when the network is slightly slower than usual.

Over time, more tests are added on top of an unstable foundation. Small timing issues, hidden dependencies, shared test data, and environment assumptions pile up. The suite still works — just not reliably.

Each failure steals a few minutes.

Five minutes here. Ten minutes there.

No one tracks it.

But by the end of the sprint, hours are gone.

“Just Rerun It” — The Moment Trust Starts to Break

Every team reaches a moment where someone says:

“Just rerun it. It’s probably flaky.”

That sentence feels harmless. But it marks a turning point.

From that moment on, a failed test is no longer a signal. It becomes noise. Engineers stop investigating immediately. Real failures hide behind false ones. Bugs survive simply because nobody believes the test anymore.

Automation without trust becomes worse than no automation at all.

The Cost That Never Makes It Into Metrics

Flaky tests rarely show up as explicit delays, but they consume time constantly.

A few minutes lost rerunning pipelines. Context switching to investigate failures that lead nowhere. Manual checks added “just in case.” Conversations spent debating whether a failure is real or not.

Individually, these moments seem insignificant.

Together, they add up to hours every sprint.

And because this time is fragmented, it never appears in velocity charts or sprint summaries. Velocity looks fine. Delivery continues. But the team is slower, more cautious, and more tired than it needs to be.

This hidden cost accumulates quietly, sprint after sprint.

The Trust Problem No Dashboard Shows

The most dangerous thing flaky tests break is not the build.

It’s trust.

When tests are reliable, a failure means something. It triggers investigation, discussion, and learning. When tests are flaky, failures become background noise.

People stop reacting.

Developers stop looking closely at red builds. Product owners stop asking what failed. QAs stop feeling confident in pushing back.

Flaky Tests Are Feedback

Flakiness is rarely random. It is usually a symptom.

It points to unstable environments, poor synchronization, shared state, unrealistic test data, or tests that are trying to do too much. Treating flaky tests as isolated annoyances misses the opportunity to learn from them.

Treating flaky tests as isolated annoyances guarantees they will keep coming back.

Treating them as feedback about the system — and the testing strategy — is where improvement starts.

What Strong Teams Choose to Do

Teams with mature automation are willing to make uncomfortable choices.

They pause the feature work to fix stability. They disable or remove tests that cannot be trusted. They prioritize signal over coverage. They understand that a test suite is only as valuable as its reliability.

They don’t aim to impress with numbers.

They aim to be confident when a test fails.

They stop asking, “Did the test pass?” and start asking, “Can we trust this test?”

A flaky test is no longer a QA inconvenience — it’s a risk indicator. It signals unstable environments, poor test design, unclear requirements, or hidden performance issues.

Some teams start small. They track flaky failures explicitly. Others dedicate time each sprint to stabilize one problematic area. The important part isn’t the technique — it’s the visibility.

Once flakiness is visible, it becomes fixable.

Best Practices to Prevent and Fix Flaky Tests

Flaky tests are not something you eliminate with a single refactor or a clever retry mechanism. They require a mindset shift and consistent discipline.

Strong teams start by treating flakiness as a defect, not a nuisance. If a test cannot be trusted, it should not be allowed to influence release decisions. This often means temporarily disabling unstable tests instead of letting them silently poison the signal. A smaller, reliable test suite is far more valuable than a large, noisy one.

From a technical perspective, the focus should be on isolation and determinism. Tests need stable data, clear ownership of the state, and realistic synchronization instead of arbitrary waits. Environments must be as predictable as possible, and shared dependencies should be minimized. When flakiness appears repeatedly in the same area, it is usually pointing to a deeper design or architecture issue that deserves attention.

Equally important is visibility. Track flaky tests explicitly. Talk about them openly in retrospectives. Make their cost visible to the team instead of normalizing reruns and manual checks. When teams create space to fix flakiness, rather than work around it, automation slowly earns back its credibility.

Fixing flaky tests is rarely glamorous work, but it is foundational. It is an investment in trust — and trust is what makes automation truly valuable.

Final Thoughts

A green pipeline full of flaky tests is not a success. It’s borrowed confidence. And borrowed confidence always comes with interest.

The interest is paid in longer releases, missed bugs, tense discussions, and eventually, a loss of faith in automation itself.

Flaky tests don’t usually break releases. They slowly erode confidence, focus, and morale. And because none of that fits neatly into a sprint report, the cost is easy to overlook.

If your automation cannot be trusted, it is not protecting quality. It is only creating the illusion of it.


Level up your QA skills — subscribe for quick weekly insights

We don’t spam! Read our privacy policy for more info.

Level up your QA skills — subscribe for quick weekly insights

We don’t spam! Read our privacy policy for more info.

Comments

No comments yet. Why don’t you start the discussion?

Leave a Reply

Your email address will not be published. Required fields are marked *